Tell us about your project
Call 289-731-2086 or send an enquiry. You get a personal reply within 15 minutes during business hours.
BASEMENT RENOVATIONS · COURTICE
Courtice is changing fast, with a new GO station planned and whole new neighbourhoods on the drawing board. Plenty of families already here are looking down, not out, for more room. Oakridge is owner-led by Ben and John, and a Courtice basement starts with a free meeting at your kitchen table and a look downstairs.

Clarington Council adopted the Courtice Transit-Oriented Community Secondary Plan on December 15, 2025, and it still needs provincial approval. The plan covers land south of Bloor Street and north of Highway 401, between Robinson Creek and Tooley Creek and Highway 418. It is built around a future Courtice GO station and includes eight new schools and 13 new parks.
Two other plans are already in effect. The Southwest Courtice Secondary Plan extends Townline Road South to the future station. The Southeast Courtice plan sets out a mix of densities along Bloor Street and Courtice Road. For an existing homeowner, the point is simple: more people will be looking for places to live near transit, and a legal basement unit is one way to answer that.
Courtice is creek country. The Municipality's subwatershed study says the Robinson Creek watershed sits almost completely within the Courtice urban area, and parts of Tooley Creek run through it too. To the west, Black, Harmony and Farewell creeks share one watershed plan with the Central Lake Ontario Conservation Authority. Metrolinx's GO extension work includes new bridges at Courtice Road, Farewell Creek and Harmony Creek.
A lot backing onto a valley can sit inside a regulated area. Clarington does not allow additional dwelling units in floodplains or land zoned Environmental Protection. Before we suggest a walkout or a basement unit on a ravine lot, we check the mapping.
Clarington's housing stock leans newer than its neighbours'. Across the whole municipality, about 27% of the 35,950 occupied dwellings counted in 2021 were built before 1981. Statistics Canada does not publish a separate figure for Courtice, so we treat each house on its own merits.
At the site meeting we check ceiling height under the ducts and beams, where the floor drain and any rough-in sit, the condition of the sump, and how the furnace and panel can stay reachable. We also look for signs of past water. Plans that skip that step tend to cost more later, and our moisture guide explains why.
It helps to have a few things ready for that first visit: any past permits or drawings for the house, a rough idea of how you want to use the space, and photos of any water you have seen. None of it is required, but it makes the written estimate sharper. Our site meeting guide explains what we cover.
Courtice sits between Oshawa and Bowmanville, next to Highway 418, which the Province made toll-free on April 5, 2022. Clarington says it has long supported GO train expansion to Courtice and Bowmanville, and Metrolinx is now building the extension. For many owners, that mix of highway and transit access is what makes a basement suite worth a look.
It is still worth being realistic. A legal unit needs a permit, fire separation between the units, a proper exit, alarms and a parking space. Some Courtice basements can take all of that with modest changes. Others need a new entrance, larger windows or major mechanical work. We tell you which one you have before you spend money on drawings.
Permits for Courtice come from Clarington's Building Division, and applications go through the Service Clarington portal. Its list of work that normally needs a permit includes partitioning a basement, adding a basement entrance, creating an apartment and altering or adding plumbing. New interior finishes and basement waterproofing repairs normally do not.
Clarington publishes its inspection stages, and a basement typically meets these:
Clarington names Courtice among the areas where two additional dwelling units may be allowed: one in the house and one in an accessory building. The Municipality calls them secondary suites, in-law suites or basement apartments, and says the process starts with a conversation with Planning staff.
Parking is the rule that trips people up. Each unit needs an extra space, the house keeps its two, and the front yard has to keep 30% landscaped open space. Registration is built into the permit: once the building inspector grants occupancy, the unit is considered registered with the Municipality. Our legal suite guide covers the Code side, from fire separation to exits.
If the unit is for a family member rather than a tenant, the same rules apply. The difference is usually in the layout and finishes you choose.
We have not yet published a finished basement in Courtice. Our completed basement renovations so far are in Lindsay and in Port Hope, and both clients' reviews are on our basements page. We would rather say so than show someone else's photos.
What pushes a Courtice budget up or down is mostly scope: a bathroom and where its drains run, an egress window for a bedroom, and whether you are building family space or a registered unit. Our pricing page and cost guide explain how we build an estimate. Bowmanville, just east, has its own page.
Downtown Courtice has two community improvement grant programs, but they are for building upgrades in the downtown area, not for basement units. We have not found an open grant for additional dwelling units in Clarington, so we do not build one into anyone's budget.
BASEMENT COSTS IN COURTICE
Every basement in Courtice starts from a different place, so we price each one after seeing it. These are the things that move the number most.
Permit rules and forms come from Municipality of Clarington. These are the pages we work from.
“He framed and drywalled with excellent results. He laid a new floor and took particular care with the finishing touches… He was attentive during the whole process and showed respect and care of my home.”
“Amazing crew to fulfill your reno dreams! The guys are punctual, skilled, and super friendly. I’d highly recommend them!”
Call 289-731-2086 or send an enquiry. You get a personal reply within 15 minutes during business hours.
We visit the property, look at the space and the conditions, and talk through what you want from it.
You receive a written scope and estimate that says what is included, before any work is booked.
QUESTIONS FROM COURTICE HOMEOWNERS
Still deciding? Explore basement renovations or read our service areas.
Nearby: Basement renovations in Oshawa · Basement renovations in Bowmanville
In many cases, yes. Clarington lists Courtice among the areas where two additional dwelling units may be permitted, one in the house and one in an accessory building. You need a building permit, an extra parking space for each unit and enough landscaped front yard. We start with ceiling height, exits and the mechanical layout, then confirm zoning.
Clarington's list says permits are normally required for partitioning a basement, adding an entrance, creating an apartment and any plumbing changes. New finishes on existing walls and ceilings, and waterproofing repairs, normally are not. Most real basement projects add walls or plumbing, so most need a permit. We confirm your scope before applying.
It happens through the permit. Clarington says that once the building inspector grants occupancy, the additional dwelling unit is complete and considered registered with the Municipality. So the key is getting the permit, passing each inspection and booking the final. We plan the job around those stages.
It can. Clarington does not allow additional dwelling units in floodplains or areas zoned Environmental Protection, and CLOCA regulates land near creeks such as Black, Harmony and Farewell. Interior finishing is less affected, but a walkout or new unit needs checking. We look at the mapping for your lot first.
Clarington publishes its inspection stages. For a typical basement, expect a plumbing rough-in inspection, a framing inspection once the heating, plumbing and ventilation rough-ins are in, then insulation and air barrier, and finally building and plumbing occupancy. We book each stage so nothing gets covered before it is checked.
Call 289-731-2086 or send your address and a short note about the basement. During business hours, Monday to Friday from 8am to 6pm, we reply personally within 15 minutes. After a free site meeting at your home, you receive a written estimate organized by trade, with permits and allowances spelled out.
YOUR HOME. YOUR NEXT CHAPTER.
A free site meeting is a useful place to start.